Cranbrook Windmill restoration

Designed external scaffolding to decking and MEWP access Replace sections of boarding along with isolated repairs using dry-flex. Installation of a crane to remove the sails Replacement of structural timber members including shoring works Repairs to window including re-glazing. Decking repairs. Removal of oil-based paints to brickwork and recoating with limewash. Repairs to sails. Repairs […]
Westcourt School new build

Biodiversity Enhancement Green Spaces Integration: Enhanced the school’s grounds through biodiversity-friendly landscaping, including the re-turfing of grassed areas and the reinstatement of local playground furniture. These efforts encouraged local wildlife and provided a greener environment for students. Sustainable Planting: Incorporated native plant species into the re-turfed areas and playground surroundings, contributing to local biodiversity and […]
Oasis Secondary School Refurbishment

Biodiversity Enhancement Internal Green Features: Introduced indoor green walls in key communal areas, such as corridors and common rooms, using plant species that improve air quality and create a more vibrant and healthy environment for students and staff. Sustainable Landscaping: Refreshed the exterior surroundings with new planting schemes that included native flora, enhancing the outdoor […]
Davington School New Build

Works Working in a live school Ground clearance and setting out. Connection of new drainage system and other services. Excavation and installation of new concrete substructure. Installation of new soakaway. Installation of new temporary road. Complex scaffold installation. Setup of a crane and hoist to lower units into correct position. New electrical installation with […]
Nonington school refurbishment & extension

Ground clearance and setting out. Connection of new drainage system and other services. Excavation and installation of new concrete substructure. Installation of new soakaway. New steel framed extension with brick in-fill. Complex scaffold installation. Setup of a crane and hoist to deploy steelwork. Installation of new BMS system with new M&E and ventilation that works […]
Ursuline College historic refurbishment and new build

Works Local authority and listing building approval Full elevational designed scaffolding and temporary roof Removal of existing concrete roof deck throughout school and replacement with new profiled metal deck, elastomeric felt waterproof covering and laid to falls insulation Replacement roof with new timbers and Welsh slate covering ,complete with all detailing and […]
QEQM Hospital Thanet

A comprehensive internal refurbishment and structural upgrade project at the Flete Unit, transforming the building into the new Thanet Sexual Health Centre. The project involved managing complex design and construction processes for a healthcare facility, ensuring compliance with NHS and local authority standards. Contract Form & Value To deliver the project on time, the following […]
Cottage Hospital refurbishment

Refurbishment works to Deal, Faversham, Sevenoaks, Tonbridge, and Whitstable Hospitals Scope of Works Compliance & Safety Improvements: Comprehensive survey and safe removal of all asbestos-based materials, ensuring compliance with NHS health & safety standards. Structural repairs and internal alterations to improve hospital functionality. Mechanical & Electrical Upgrades: Installation of new mechanical systems, including air-conditioning and […]
SECAMB NHS Make Ready Centre – Paddock Wood

Scope of Works: Reconfiguration & Repurposing of Existing Spaces: Transformation of the existing facility into a fully functional Make Ready Centre, ensuring compliance with NHS ambulance service operational requirements. Conversion of underutilised areas to create new crew mess facilities, education spaces, and support offices. Structural alterations and partitioning within the main garage space to define […]
Canterbury West Railway Station

Challenges Works were a challenge as the erection of the scaffolding was over the track so Redec had to take full possession of the main high-speed line to facilitate this. This was overcome by employing our COSS Team to agree track closures with Network Rail to allow the works to proceed. Works […]