Scope of Works:
- Reconfiguration & Repurposing of Existing Spaces:
- Transformation of the existing facility into a fully functional Make Ready Centre, ensuring compliance with NHS ambulance service operational requirements.
- Conversion of underutilised areas to create new crew mess facilities, education spaces, and support offices.
- Structural alterations and partitioning within the main garage space to define new functional areas.
- Mechanical & Electrical Upgrades:
- Full electrical rewiring, including new power supplies and data cabling to support enhanced IT infrastructure.
- Installation of energy-efficient LED lighting throughout all areas to improve visibility and reduce operational costs.
- Upgraded ventilation and climate control systems, ensuring a comfortable environment for staff and paramedics.
- Interior Refurbishment & Finishes:
- High-durability floor finishes suitable for a healthcare and emergency response environment.
- Full internal redecoration with wipeable, infection-control compliant paint systems.
- Installation of new kitchenette and welfare facilities within the crew mess area to support ambulance staff during shift breaks.
- Compliance & Accessibility Enhancements:
- Installation of DDA-compliant WCs and accessible welfare facilities.
- Fire safety improvements, including enhanced fire-rated partitioning and emergency lighting systems.
- New security measures, including controlled access points and CCTV installation to maintain site safety.
- Project Management & Operational Coordination:
- Delivered in a live operational environment with strict phased working strategies to prevent disruption to ambulance services.
- Daily liaison with NHS Trust representatives to coordinate access and ensure emergency response readiness was never compromised.
- Achieved a 99.1% client satisfaction rating, with KPIs on programme adherence, quality, and minimal downtime for operational staff.