Nonington school refurbishment & extension

  • Ground clearance and setting out.
  • Connection of new drainage system and other services.
  • Excavation and installation of new concrete substructure.
  • Installation of new soakaway.
  • New steel framed extension with brick in-fill.
  • Complex scaffold installation.
  • Setup of a crane and hoist to deploy steelwork.
  • Installation of new BMS system with new M&E and ventilation that works with current school’s provision.
  • Flat roofing system.
  • New electrical installation with data.
  • Full internal fit-out with carpets, SMARTboards, painting etc.
  • Installation of new air-conditioning system.
  • Installation of DDA compliant powered access doors and WCs.
  • Various local renewals of paved areas.
  • Re-turfing to the grassed areas locally.
  • Reinstatement of local playground furniture.
  • All delivered while the main school was in session with no loss or disruption.