- Ground clearance and setting out.
- Connection of new drainage system and other services.
- Excavation and installation of new concrete substructure.
- Installation of new soakaway.
- New steel framed extension with brick in-fill.
- Complex scaffold installation.
- Setup of a crane and hoist to deploy steelwork.
- Installation of new BMS system with new M&E and ventilation that works with current school’s provision.
- Flat roofing system.
- New electrical installation with data.
- Full internal fit-out with carpets, SMARTboards, painting etc.
- Installation of new air-conditioning system.
- Installation of DDA compliant powered access doors and WCs.
- Various local renewals of paved areas.
- Re-turfing to the grassed areas locally.
- Reinstatement of local playground furniture.
- All delivered while the main school was in session with no loss or disruption.